45-day build lanes
Strips
One lane for each vehicle with a move, test, note or assign dated from 3 Oct to 16 Nov, the 45 days through the ledger stamp. The band is the confirmed whole-vehicle place: a whole-vehicle move or a sourced identify the fold applied. A section move does not move the band. A test does not place the vehicle. An unconfirmed claim is a hollow mark and does not paint the band. A stretch with no stated place is UNKNOWN. A mark and its date open the ledger row, which carries that claim's source cards.
- Move
- Test
- Note
- Assign
- Hollow is unconfirmed
B22 Booster 22
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-09 | assign | none | Assign Booster 22 as the booster on Flight 15. NSF says Flight 15 is currently set to use S42 and B22. | UNCONFIRMED |
| 2026-10-09 | note | MB1 | Booster 22 is still in Mega Bay 1 as of the 9 Oct NSF report, pending static fire readiness. | UNCONFIRMED |
| 2026-10-16 | note | none | Seen on a flyover: Booster 22 was waiting to roll out for pre-flight static fire testing. | UNCONFIRMED |
| 2026-10-19 | note | none | The OLM work platform has been removed from the OLM ahead of Booster 22's static fire campaign. The post does not name the pad. | UNCONFIRMED |
| 2026-10-23 | note | none | NSF says Booster 22 heads to Pad 2 overnight for a potential weekend static fire test, under a Production to Pad road delay from 23:59 to 04:00 CDT. | UNCONFIRMED |
| 2026-10-23 | note | none | The City of Starbase moved the Production to Pad road delay to Saturday 24 Oct, 02:00 to 06:00 CT (it was Friday 23:59 to Saturday 04:00 CT). | UNCONFIRMED |
| 2026-10-24 | move | P2 | Booster 22 was lifted onto a transport stand, left Mega Bay 1, drove Highway 4 and arrived at the launch site (Pad 2) on the morning of 24 Oct ahead of its static fire campaign. | confirmed |
| 2026-10-24 | note | P2 | With cranes down, Booster 22 on the mount, BQDs engaged and blast doors closed, VickiCocks15 says Pad 2 looks locked up ahead of testing planned for 25 Oct. | UNCONFIRMED |
| 2026-10-24 | note | P2 | Booster 22 was lifted onto the Pad 2 orbital launch mount and lowered onto it on the afternoon of 24 Oct. | confirmed |
| 2026-10-25 | note | P2 | The booster transport stand left the Pad 2 launch site ahead of the Booster 22 static fire; VickiCocks15 says it was moved to gate D1 for safety. | confirmed |
| 2026-10-25 | test | P2 | Booster 22 completed a static fire test on Pad 2 at Starbase. Blobifie reports the burn lasted more than 15 seconds. | confirmed |
| 2026-10-25 | assign | none | Assign Booster 22 as the booster on Flight 15. SpaceX called the Booster 22 static fire a static fire for Flight 15. | confirmed |
| 2026-10-25 | note | P2 | Booster 22 was detanked after its static fire on Pad 2. | UNCONFIRMED |
| 2026-10-25 | note | P2 | SpaceX called the Booster 22 static fire for Flight 15 a full duration 33-engine static fire. | confirmed |
| 2026-10-25 | note | P2 | After the static fire, the Pad 2 chopsticks descended and closed in around Booster 22, as stated by VickiCocks15. | UNCONFIRMED |
| 2026-10-25 | note | P2 | Booster 22 was lifted off the Pad 2 launch mount to catch height at the top of the tower, then set on the booster transport ring for its trip back to Mega Bay 1 for final flight preparations. | confirmed |
| 2026-10-26 | move | MB1 | Booster 22 was moved from Pad 2 back to Mega Bay 1 overnight after its static fire. | confirmed |
| 2026-11-09 | note | none | VickiCocks15 says the booster transport ring was delivered to Mega Bay 1 ahead of Booster 22 moving to the pad before launch, and that the road delay was pushed back to 20:00 local time on 9 Nov. | UNCONFIRMED |
| 2026-11-09 | note | MB1 | VickiCocks15 says the Booster Transport Ring was delivered to Mega Bay 1 ahead of Booster 22 moving to the pad for launch, and that the booster lifting jig was moved into Mega Bay 1 on 8 Nov. | UNCONFIRMED |
| 2026-11-09 | move | P2 | Booster 22 left the production site and arrived at the Pad 2 launch site on the evening of 9 Nov (Texas time), for Flight 15. Trackers posted it as T-93 hours. | confirmed |
| 2026-11-10 | note | P2 | Booster 22 was lifted to the top of the Pad 2 tower, moved around on the chopsticks using the pusher system, and lowered onto the orbital launch mount. VickiCocks15 later described it as settled on the mount with the clamps lined up. | confirmed |
| 2026-11-11 | note | P2 | The Pad 2 chopsticks released Booster 22 and descended the tower and the SQD arm was reset. Workers then spent several hours around B22's catch pins and grid fins, the booster transport stand returned to the build site, the SQD was retracted and the chopsticks went back to the booster support position. | confirmed |
| 2026-11-11 | note | P2 | VickiCocks15 says the Pad 2 chopsticks released Booster 22 again on 11 Nov and returned to the side of the launch mount, with the crew lift that had worked on the grid fins moved away, then later the chopsticks moved back up the tower and hugged Booster 22 once more. She also says one of the chopstick sims was put back in the Super Crusher cage, suggesting testing of 43.1 is not finished. | UNCONFIRMED |
| 2026-11-13 | note | none | SpaceX says Super Heavy diverted to an offshore splashdown in the Gulf on Flight 15 instead of the planned catch; LabPadre logged the booster divert at T+00:06:35 and NASASpaceflight carried SpaceX's Dan Huot saying Booster 22 automatically aborted the return to Pad 2 due to a GNC issue. | confirmed |
| 2026-11-14 | note | none | TrackingTheSB says the remains of Booster 22 seem to have gone fully under the water during the night, citing NASASpaceflight imagery. | UNCONFIRMED |
| 2026-11-14 | note | none | LabPadre says Kate confirmed Booster 22's boostback burn ended early on a low fuel mass alarm, and the booster then autonomously judged itself out of position for a catch and diverted. | UNCONFIRMED |
| 2026-11-14 | note | none | Elon Musk says the green flame on Flight 15 came from burning copper from depleting fuel in the regenerative cooling circuit as the main combustion chamber went oxygen-rich, caused by slight engine underperformance. | confirmed |
| 2026-11-14 | note | none | Blobifie says Dan Huot stated the Booster 22 landing abort was a GNC issue that led to a self abort and a Gulf splashdown, and that the flight termination system triggered after engine cutoff. | UNCONFIRMED |
| 2026-11-14 | note | none | Elon Musk says the booster is meant to land with tiny residuals, so the fix is better engine performance and consistency (underway with Raptor V3.2) plus flight software that does MECO1 about one second earlier to leave enough propellant for boostback and landing. | confirmed |
B23 Booster 23
F16 UNCONFIRMED
Confirmed place by day
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-09 | assign | none | Assign Booster 23 as the booster on Flight 16. NSF names B23 with S43 for the first LC-39A Starship flight; on 15 Oct NSF again tied B23 cryo at Massey's to Flight 16. | UNCONFIRMED |
| 2026-10-12 | move | MB1 | Booster 23 lifted onto the booster cryo / thrust sim stand. | confirmed |
| 2026-10-13 | move | MAS | Booster 23 rolled from the production site to Massey's for its initial cryo proof testing. | confirmed |
| 2026-10-15 | test | MAS | Booster 23 underwent its first cryogenic proof test at Massey's. | confirmed |
| 2026-10-15 | note | MAS | Aerial view shows Booster 23 at Massey's. | UNCONFIRMED |
| 2026-10-18 | move | MB1 | Booster 23 left Massey's after completing cryogenic proof testing and is headed back to the production site on Highway 4. | confirmed |
| 2026-10-18 | note | MB1 | NSF (18 Oct): Booster 23's cryo testing at Massey's concluded over the weekend with a Sunday morning trip back to Mega Bay 1 for engine installation. | UNCONFIRMED |
| 2026-10-18 | note | none | TrackingTheSB weekly: Booster 23 completed only one cryogenic proof test at Massey's before rolling back to the production site. Every previous booster apart from BN3 in 2021 did at least two; the cause of the early end is not known. | confirmed |
| 2026-10-28 | note | MAS | FelixSchlang says Booster 23 is expected to begin a second round of cryogenic testing at Massey's, where it sat alongside Ship 42. | UNCONFIRMED |
| 2026-10-28 | move | MAS | Booster 23 was placed on the cryogenic proof stand at Mega Bay 1 and then left the production site for Massey's again early on 28 Oct (local time) for cryo testing. | confirmed |
| 2026-10-30 | move | MB1 | Booster 23 left Massey's early on 30 Oct (local time), drove back along Highway 4 and returned to Mega Bay 1 at the production site. | confirmed |
B24 Booster 24
Confirmed place by day
- UNKNOWN 3 Oct to 16 Nov
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-07 | move | MB1 | Booster 24 A6:4 rolled from Starfactory to Mega Bay 1. | confirmed |
| 2026-10-07 | move | MB1 | Booster 24 methane landing tank and lower transfer tube rolled from Starfactory to Mega Bay 1. | confirmed |
| 2026-10-08 | move | MB1 | Booster 24 full transfer tube rolled into Mega Bay 1. | confirmed |
| 2026-10-14 | move | MB1 | Booster 24 LOX landing tank took a long route from Starfactory into Mega Bay 1 for installation. | confirmed |
| 2026-10-16 | note | none | Seen on a flyover: Booster 24 was getting its LOX landing tank installed, with Booster 22 behind it. The post does not name the building. | UNCONFIRMED |
| 2026-10-18 | note | MB1 | TrackingTheSB weekly: in Mega Bay 1, Booster 24 received its final aft section (AX:2) and its landing tank, completing the lower half of the booster that makes up the LOX tank. CH4 tank stacking and mating the two halves come next. | confirmed |
| 2026-10-20 | note | MB1 | Booster 24's A2:4 section was delivered to Mega Bay 1 for stacking. | UNCONFIRMED |
| 2026-10-22 | note | MB1 | TrackingTheSB weekly: Booster 24 received its forward section this week, F2:4 on 20 Oct, HS-FX:3 on 22 Oct and F3:4 on 24 Oct. | UNCONFIRMED |
| 2026-10-24 | note | MB1 | Booster 24's F3:4 section was moved from Starfactory into Mega Bay 1; VickiCocks15 says this section will complete the booster's body build. | UNCONFIRMED |
| 2026-10-29 | note | none | VickiCocks15 reports the booster LOX landing tank install jig was brought back towards Mega Bay 1, and reads it as crews being about ready to stack the two halves of Booster 24; the jig supports the tank during stacking. | UNCONFIRMED |
| 2026-10-30 | note | none | VickiCocks15 reports the LOX landing tank jig, moved into position the day before, was moved back inside Mega Bay 1 this morning for Booster 24 stacking ops. | UNCONFIRMED |
| 2026-10-31 | note | MB1 | VickiCocks15 says the LOX landing tank jig was removed from MB-1 again, which she reads as Booster 24 now being fully stacked inside the bay. | UNCONFIRMED |
B25 Booster 25
Confirmed place by day
- UNKNOWN 3 Oct to 1 Nov
- MB1 2 Nov to 16 Nov
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-11-04 | note | MB1 | Flight2Starship says Booster 25's 3rd section was moved into Mega Bay 1 for stacking (photo credit Avidspace). The starship-tracking live feed the same evening names the section A3:4 rolled into Megabay 1. | UNCONFIRMED |
| 2026-11-07 | note | MB1 | The TrackingTheSB weekly says Booster 25's A4:4 section joined the rest of the booster in Mega Bay 1 on Saturday 7 Nov, after its A3:4 section rolled in on Thursday. | confirmed |
| 2026-11-10 | note | MB1 | VickiCocks15 says Booster 25's A5 section was relocated to Mega Bay 1 while the attached lift of Ship 45 was underway. Her first post named Booster 45 and a later post corrected it to Booster 25. | UNCONFIRMED |
| 2026-11-12 | note | none | VickiCocks15 says Booster 25's A6 section headed towards MB-1 on 12 Nov, followed by the associated LOX landing tank, and that the rear Gigabay door was closed for the first time she has seen. | UNCONFIRMED |
S39.1 S39.1
Confirmed place by day
- UNKNOWN 3 Oct
- MAS 4 Oct to 16 Nov
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-04 | move | MAS | S39.1 rolled from the production site back to Massey's. Reason unclear. | confirmed |
| 2026-10-25 | note | none | Blobifie reported on 25 Oct that test tank S39.1 had recently completed its 14th or 17th cryo proof test (the count differs by source), its first test in over 3 months. The post does not give the test date. | UNCONFIRMED |
| 2026-11-08 | note | none | TrackingTheSB Starbase This Week (8 Nov) says SpaceX cut test tank S39.1 in half, ending its career as one of the test tanks at Massey's. | UNCONFIRMED |
S40 Ship 40
F13 UNCONFIRMED
Confirmed place by day
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-07 | move | PoB | S40, the Flight 13 ship, arrived at the Port of Brownsville on the morning of 7 Oct after 75 days at sea. | UNCONFIRMED |
| 2026-10-07 | move | PoB | Ship 40 arrived at the Port of Brownsville aboard Forte, 75 days after its Indian Ocean splashdown. | confirmed |
| 2026-10-10 | move | SAN | Ship 40 offloaded from Forte and rolled overnight from the Port of Brownsville to the production site. | confirmed |
| 2026-10-12 | move | MB2 | Ship 40 broken over and lifted vertical inside Mega Bay 2, its first tip-up since recovery, using two cranes and the SHT-SAF. | confirmed |
| 2026-10-13 | note | none | SpaceX: S40, the first Starship to return to its launch site, is vertical alongside three other ships in a Mega Bay at Starbase and will give first-of-its-kind data on a flown heatshield, Raptor engines and avionics. The post does not name the bay. | confirmed |
| 2026-10-15 | note | MB2 | NSF Starbase summary: S40 now stands inside Mega Bay 2 with three future flight vehicles, naming the bay SpaceX left unnamed on 13 Oct. NSF footage shows a hexagonal breakover frame pinned to the base of S40 so it pivoted on rollers as the front bridge crane raised it. | UNCONFIRMED |
| 2026-10-18 | note | MB2 | TrackingTheSB weekly: after its tip-up, Ship 40 was moved into Mega Bay 2 and placed onto one of the work stands in the building. The post says SpaceX's plans for it are unknown, and whether it goes on display or is scrapped is not known. | confirmed |
| 2026-10-31 | note | MB2 | RGVaerialphotos posted a photo of Ship 40 inside Mega Bay 2. | UNCONFIRMED |
| 2026-11-07 | move | GB-TX | Ship 40 was lifted onto a transport stand in Mega Bay 2, rolled out of Mega Bay 2 and moved into a Gigabay work cell, the first vehicle to enter the Gigabay. The TrackingTheSB weekly says it went around Sanchez and the parking garage to the front of the Gigabay, with visible rust and damage to both flaps. | confirmed |
S42 Ship 42
Confirmed place by day
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-09 | note | MAS | Reported by 9 Oct: SpaceX removed all six engines from S42 and rolled it to Massey's for a third time, onto the ship cryo-proof stand. NSF says this work needs thrust ram testing, not just a cryo proof, before a static fire. | UNCONFIRMED |
| 2026-10-09 | move | MAS | Ship 42 rolled to Massey's on the ship cryo stand after all 6 engines were removed. | confirmed |
| 2026-10-09 | test | MAS | Ship 42 frosted on both tanks during cryo testing. | confirmed |
| 2026-10-09 | assign | none | Assign Ship 42 as the ship on Flight 15. NSF says Flight 15 is currently set to use S42 and B22. | UNCONFIRMED |
| 2026-10-10 | move | MB2 | Ship 42 returned to Mega Bay 2 after its third round of testing at Massey's. | confirmed |
| 2026-10-18 | note | MB2 | TrackingTheSB weekly: inside Mega Bay 2, Ship 42 has engines installed again ahead of its static fire campaign for Flight 15, after all of its engines were removed following Flight 14. The post says the reason for the removal is not known. | confirmed |
| 2026-10-24 | note | none | LewisKnaggs42 says Ship 42 could go to Massey's on the night of 24 Oct if Ship 43 returns; FelixSchlang later reports the City of Starbase took down the Production to Massey's road delay for Sat 24 Oct 23:59 to Sun 04:00 CT. | UNCONFIRMED |
| 2026-10-25 | note | MAS | VickiCocks15 expects Ship 44 to move to the centre stand and Ship 43 and Ship 42 to swap places at Massey's in the night transport move, for an S42 static fire test. | UNCONFIRMED |
| 2026-10-25 | note | MB2 | The ship static fire test stand was moved into Mega Bay 2 for Ship 42, and a road closure was posted for Ship 43's return from Massey's and Ship 42's trip there. | confirmed |
| 2026-10-25 | note | MB2 | Ship 42 was lifted onto the ship static fire stand and left Mega Bay 2 to take Ship 43's place at Massey's for its static fire. | confirmed |
| 2026-10-25 | note | none | TrackingTheSB weekly: SpaceX said on 23 Oct that an upgraded Raptor 3 debuts on Flight 15, which is why Ship 42's engines were removed and swapped. | UNCONFIRMED |
| 2026-10-26 | note | MAS | Ship 42 was detanked after its single-engine static fire at Massey's. | UNCONFIRMED |
| 2026-10-26 | move | MAS | Ship 42 rolled from the production site down Highway 4 to Massey's for static fire testing, followed by a ship aft barrel section with some tiles on it. | confirmed |
| 2026-10-26 | test | MAS | Ship 42 completed a single-engine static fire test at Massey's on the evening of 26 Oct (local time), after a depress vent signalled a single-engine burn. | confirmed |
| 2026-10-27 | note | none | VickiCocks15 says Ship 42 lit only one engine in its static fire, so another static fire test may still come. | UNCONFIRMED |
| 2026-10-27 | test | MAS | Ship 42 completed a six-engine, full-duration static fire test at Massey's on 27 Oct (local time), about 60 seconds long, following its single-engine static fire the evening before. | confirmed |
| 2026-10-28 | assign | none | Assign Ship 42 as the ship on Flight 15. SpaceX called Ship 42 the Starship preparing for Flight 15. | confirmed |
| 2026-10-28 | note | MAS | SpaceX said Ship 42's static fires are complete: the Starship preparing for Flight 15 performed a full-duration six-engine static fire and fired a single Raptor engine to simulate a deorbit burn. | confirmed |
| 2026-10-28 | note | MAS | VickiCocks15 says it looks like Ship 42 will be coming back to Mega Bay 2 on the night of 28 Oct (local time), after its static fire testing at Massey's. | UNCONFIRMED |
| 2026-10-28 | note | MAS | VickiCocks15 says Ship 42's flaps were retracted on the morning of 28 Oct, and that afternoon the ship left the test station and moved a short way towards the Massey's exit to wait for the trip back to Mega Bay 2. | UNCONFIRMED |
| 2026-10-29 | note | none | Elon Musk wrote that Starship 42 will be the first tower catch. | confirmed |
| 2026-10-29 | move | MB2 | Ship 42 left Massey's on Highway 4 late on 28 Oct (local time) after completing its static fire testing campaign, arrived back at the production site early on 29 Oct, was moved into Mega Bay 2 and lifted off its stand. | confirmed |
| 2026-11-10 | note | MB2 | VickiCocks15 says a Ship lift jig was raised and translated across to the right-hand side of Mega Bay 2, theoretically for Ship 42. She notes ships have previously been moved onto a STR for payload bay satellite loading. | UNCONFIRMED |
| 2026-11-12 | note | P2 | Ship 42 was driven to the Starbase launch site on 12 Nov, lifted onto Booster 22 at Pad 2 and stacked for Flight 15. SpaceX posted that Ship 42 moves to the Starbase pad ahead of launch, and NASASpaceflight posted the Ship 42 lift. | confirmed |
| 2026-11-12 | note | MB2 | Ship 42 was lifted onto a transport stand and left Mega Bay 2 on the evening of 11 Nov (Texas time) while the Starlink speed loader and loading box came over from the Starfactory to the ring yard; the loader was then lifted into Mega Bay 2, and on 12 Nov Ship 42 was moved back inside Mega Bay 2 to have its 26 Starlink V3 satellites installed. | confirmed |
| 2026-11-13 | note | none | SpaceX says Starship began deploying a payload of 26 Starlink V3 satellites on Flight 15, a sequence taking about 42 minutes. | confirmed |
| 2026-11-13 | note | none | TrackingTheSB says what looks to be alignment markers have been added to Ship 42, and that it is unclear whether they are for general operations or specific to post-catch operations. | UNCONFIRMED |
| 2026-11-13 | note | none | SpaceX says Starship performed its orbital insertion burn with a single Raptor engine and entered an orbit of Earth (about 275 km planned), after the ascent burn left it on a planned suborbital trajectory. | confirmed |
| 2026-11-13 | note | P2 | VickiCocks15 says the SQD access platform was retracted, the SQD attached to Ship 42, and a fast retract and reattach test performed. TrackingTheSB also says the SQD was being connected to Ship 42. | UNCONFIRMED |
| 2026-11-14 | note | none | LabPadre says Ship 42 deployed 26 V3 Starlink satellites by T+01:17:40 and closed its payload bay door. | UNCONFIRMED |
| 2026-11-14 | note | none | SpaceX says Starship and its heatshield are healthy in orbit and that a planned return to launch site catch at Starbase is about 22.5 hours after launch. | confirmed |
| 2026-11-14 | note | none | NASASpaceflight posted a Cybertruck procession with the Ship Transport Stand after the catch, and AshleyKillip says the stand was on the way to the launch site to collect S42. | UNCONFIRMED |
| 2026-11-14 | note | none | SpaceX says Ship 42 completed a good deorbit burn and was on course to reenter ahead of a planned catch at Starbase about an hour later. | confirmed |
| 2026-11-14 | note | P2 | LabPadre says the stabilizer pins engaged on Ship 42 as it lowered to connect the SQD, and later that the SQD attached to S42 and residual detanking began; Blobifie also says the SQD arm attached to allow detanking and safing. | UNCONFIRMED |
| 2026-11-15 | note | none | Ship 42 was lowered onto its ship transport stand at Pad 2 after the Ship QD arm retracted and a flap was retracted, then rolled back to the production site, arriving around 23:15 UTC on 15 Nov (NASASpaceflight, RGV Aerial Photography, LabPadre). | confirmed |
| 2026-11-15 | note | none | AshleyKillip says a band about 19 tiles wide on Ship 42, running from the bottom of the liquid oxygen tank up to the forward dome, has a distinct matte look where plasma appears to have ablated the layer that usually makes the tiles glossy. | UNCONFIRMED |
| 2026-11-15 | note | none | Blobifie says Ship 42 was safed and its transport stand moved to the launch site, and later (04:22 UTC) that S42 was still hanging from the chopsticks attached to the SQD, with a beacon set up in the rocket garden where it will be displayed. | UNCONFIRMED |
| 2026-11-15 | note | none | Elon Musk says he went over the whole Starship heat shield and it looks great overall, the engines look great too, and Ship 42 could probably be reflown with a few weeks of refurbishment, but many small fixes are needed for airplane-like immediate reusability. LabPadre relayed the reflight line. | confirmed |
| 2026-11-16 | note | MB2 | Blobifie says Ship 42 was moved into Mega Bay 2 via Sanchez, the first time a caught ship has returned to the build site and the second time a flown ship has been inside Mega Bay 2. TrackingTheSB says S42 rolled back to the production site early on 16 Nov. | UNCONFIRMED |
S43 Ship 43
F16 UNCONFIRMED
Confirmed place by day
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-09 | note | MB2 | Ship 43 is inside Mega Bay 2 finishing internals and is still missing its starboard-side aft flap. NSF says it was fully stacked on 15 Sep 2026. | UNCONFIRMED |
| 2026-10-09 | assign | none | Assign Ship 43 as the ship on Flight 16. NSF names S43 with B23 for the first LC-39A Starship flight (Starlink Group 30-1). | UNCONFIRMED |
| 2026-10-22 | note | MAS | Ship 43 moved its flaps at Massey's. | UNCONFIRMED |
| 2026-10-22 | move | MAS | Ship 43 was lifted onto the ship cryo stand, rolled out of Mega Bay 2 and set off along Highway 4 to Massey's for cryogenic proof testing. | confirmed |
| 2026-10-22 | note | none | VickiCocks15 says it is possible, though impossible to tell, that Ship 43 was proof tested with ambient temperature gas; after farm vents, testing moved to test tank S39.1, where frost was just visible, its 17th test. | UNCONFIRMED |
| 2026-10-22 | note | MB2 | VickiCocks15 reports the ship thrust sim stand moved into Mega Bay 2 overnight and Ship 43 was loaded onto it before leaving for Massey's for cryo testing. | UNCONFIRMED |
| 2026-10-23 | test | MAS | Ship 43 started its first cryogenic proof test at Massey's on the evening of 23 Oct. | confirmed |
| 2026-10-23 | note | MAS | Blobifie says Ship 43 completed two cryogenic proof tests at Massey's on 23 Oct. | UNCONFIRMED |
| 2026-10-25 | move | MB2 | Ship 43 left Massey's after its cryo proof testing and rolled up Highway 4 back to Mega Bay 2 at the production site overnight (local night of 25 Oct). | confirmed |
| 2026-10-26 | note | P2 | Blobifie says Ship 43 went back onto its transport stand after the Pad 2 SQD connection test, and that the post-flight safing practice went much smoother than the same test with Ship 42. | UNCONFIRMED |
| 2026-10-26 | note | MB2 | Ship 43 was lifted from the cryo stand at Mega Bay 2 as Booster 22 returned, and the cryo stand then rolled back to Sanchez. | UNCONFIRMED |
| 2026-10-26 | note | none | Ship 43 left the production site heading to Pad 2 under a Production to Pad road delay; NASASpaceflight and lewisknaggs42 say it is likely for chopstick catch tests. | UNCONFIRMED |
| 2026-10-26 | move | P2 | Ship 43 departed the production site and arrived at Pad 2 for chopstick testing. | confirmed |
| 2026-10-26 | note | P2 | At Pad 2 the chopsticks lifted Ship 43 above its transport stand and up to the top of the tower, then lowered it to the height of the ship quick disconnect (SQD) arm, which connected to it: practice for post-catch safing operations. | confirmed |
| 2026-10-27 | note | P2 | Blobifie says Ship 43 was moved to the middle of the Pad 2 chopsticks and lifted, a test simulating moving the ship forward after a catch so the stabilizer arms can engage. | UNCONFIRMED |
| 2026-10-27 | note | P2 | Ship 43 was lifted by the Pad 2 chopsticks with the landing rails deployed and moved back and forth, checking the rails and push rods after the previous night's SQD interface tests; Blobifie says this post-catch pusher test went much smoother than with Ship 42. | confirmed |
| 2026-10-27 | move | MB2 | Ship 43 left Pad 2 late on 27 Oct (local time) after its chopstick tests, arrived back at the production site and entered Mega Bay 2. | confirmed |
| 2026-11-03 | note | P2 | FelixSchlang says SpaceX recently lifted Ship 43 to catch height at Pad 2 for catch practice (photo by Jordan Guidry, WAI Media). | UNCONFIRMED |
S43.1 S43.1
Confirmed place by day
- UNKNOWN 3 Oct to 16 Nov
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-13 | test | MAS | S43.1 tested inside the Supercrusher at Massey's overnight. | confirmed |
| 2026-10-15 | note | MAS | S43.1 nosecone tip appears slightly crumpled during testing at Massey's. When that happened and how it affects remaining tests is unclear. | UNCONFIRMED |
| 2026-10-18 | note | MAS | TrackingTheSB weekly: S43.1 is a ship nosecone and header tank test article. It shows visible buckling around the nosecone tip, which the post says likely happened during a test on 14 Oct, with sensors placed around the buckled area. | UNCONFIRMED |
| 2026-10-21 | note | MAS | Test tank 43.1 went through a 10th round of testing at Massey's overnight, a relatively short test with little other than venting visible. | UNCONFIRMED |
| 2026-10-25 | note | MAS | TrackingTheSB weekly: test tank S43.1's earlier crumple was repaired and it was tested again at Massey's this week. | UNCONFIRMED |
| 2026-11-06 | note | MAS | RGVaerialphotos shows Ship 43.1 in the can crusher at Massey's. | UNCONFIRMED |
S44 Ship 44
Confirmed place by day
- UNKNOWN 3 Oct to 16 Nov
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-05 | move | MB2 | Ship 44 A2:4 rolled into Mega Bay 2. | confirmed |
| 2026-10-09 | note | MB2 | Ship 44 is on the Mega Bay 2 turntable and is missing only its transfer tubes and drive/engine section; the transfer tubes are sitting in Starfactory. | UNCONFIRMED |
| 2026-10-16 | note | MB2 | The transfer tube jig, loaded with tubes for Ship 44, moved from Starfactory into Mega Bay 2. | confirmed |
| 2026-10-17 | note | none | S44 has gained its transfer tubes. | UNCONFIRMED |
| 2026-10-17 | note | MB2 | S44, with decals applied and transfer tubes installed or being installed, sits front and centre in Mega Bay 2 awaiting a lift to a work stand for further work. | UNCONFIRMED |
| 2026-10-17 | note | none | Ship 44 was lifted onto the transfer tube install jig. | UNCONFIRMED |
| 2026-10-18 | note | MB2 | Ship 44, now fitted with its transfer tubes, was lifted clear of the transfer tube jig and moved to a work stand inside Mega Bay 2, and the jig went back to Starfactory. | UNCONFIRMED |
| 2026-10-20 | move | MB2 | Ship 44's AX:4 aft section, its final section, moved from Starfactory into Mega Bay 2 for stacking. | confirmed |
| 2026-10-22 | note | MB2 | With the Mega Bay 2 centre stand vacated by Ship 43, raceways and the left aft flap were staged in place ahead of Ship 44 taking the spot. | UNCONFIRMED |
| 2026-10-22 | note | MB2 | A crane in the Mega Bay 2 doorway was staging the right side aft flap ahead of Ship 44's move to the centre work stand. | UNCONFIRMED |
| 2026-10-23 | note | none | Ship 44's raceways have been staged ahead of install. | UNCONFIRMED |
| 2026-10-25 | note | MB2 | Ship 44 was moved to the centre work stand inside Mega Bay 2, and Ship 45 was then moved back inside the bay, as stated by VickiCocks15. | UNCONFIRMED |
| 2026-10-25 | note | MB2 | TrackingTheSB weekly: Ship 44's AX:4 section completes its major body assembly, barring aft flap install. | UNCONFIRMED |
S45 Ship 45
Confirmed place by day
- UNKNOWN 3 Oct to 16 Nov
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-09 | note | SFC | NSF reports Ship 45 nose cone stacked on its payload bay at Starfactory, waiting for Ship 44 to finish stacking before S45 leaves the Starfactory turntable. | UNCONFIRMED |
| 2026-10-23 | note | MB2 | Ship 45's forward section moved into Mega Bay 2 and was sleeved over the Pez Dispenser mechanism, having moved out of Starfactory the previous evening. | confirmed |
| 2026-10-24 | note | none | VickiCocks15 says the Pez mechanism install jig and ring stand from the Ship 45 forward section were removed from MB-1, with the ship section mid-air on the lift jig (an earlier 23 Oct report placed that section in Mega Bay 2). | UNCONFIRMED |
| 2026-10-24 | move | RY | Ship 45 was moved out of Mega Bay 2 into the ring yard on the night of 24 Oct, as stated by VickiCocks15. | UNCONFIRMED |
| 2026-10-24 | note | MB2 | An alternate stand arrived in Mega Bay 2 and Ship 45 now sits on it inside the doorway. | UNCONFIRMED |
| 2026-10-25 | note | MB2 | Ship 45's forward dome section arrived in Mega Bay 2. Blobifie says S45 was moved out of and back into the bay more than once on 24 and 25 Oct. | confirmed |
| 2026-10-26 | note | MB2 | Blobifie reports Ship 45's forward dome moved into Mega Bay 2. | UNCONFIRMED |
| 2026-10-31 | note | MB2 | VickiCocks15 says the Ship 45 common dome section was moved from Starfactory into Mega Bay 2 and was seen being lifted off its stand for integration with the ship. | UNCONFIRMED |
| 2026-11-03 | note | MB2 | VickiCocks15 says the Ship 45 A2:3 section was relocated from Starfactory into Mega Bay 2 on the morning of 3 Nov. | UNCONFIRMED |
| 2026-11-05 | note | MB2 | VickiCocks15 says Ship 45's A3:4 section moved into Mega Bay 2 on the evening of 5 Nov. A later clip the next morning says S45 picked up that A3:4 section overnight, with one more section left before the stack is complete. | UNCONFIRMED |
| 2026-11-07 | note | MB2 | Ship 45's transfer tubes, pre-loaded on the installation jig, rolled through the Gigabay into Mega Bay 2. VickiCocks15 says the four point lifter went into Mega Bay 2 first to lift S45, then the transfer tube jig, then a single Raptor engine. | confirmed |
| 2026-11-10 | note | MB2 | Ship 45 was sleeved over its transfer tubes in Mega Bay 2 and the jig removed, then the final Ship section arrived. VickiCocks15 describes the sequence; lewisknaggs42 says the nose cone rollout to the aft section took 19 days, credited to LabPadre. | confirmed |
BLT-TA Booster landing tank test article
Confirmed place by day
- UNKNOWN 3 Oct to 16 Nov
| Date | Type | Site | Summary | Confidence |
|---|---|---|---|---|
| 2026-10-06 | test | MAS | Booster landing tank test article appeared to burst near its base during a cryo test, spilling liquid nitrogen. Intentional or not is unconfirmed. | UNCONFIRMED |